PROTECT BOX

Installation instructions.

Features

  • Designed to meet blower door test.
  • Constructed using a high temperature resistant Rockwool insulation with an aluminium laminate outer surface to give zero distance to combustibles.
  • An EPDM kit is available to allow for the chimney to pass through an air tight membrane at ceiling level in a cold roof construction or at roof level in a warm roof construction.
  • Standard height 700 mm to meet new roof insulation requirements.

INSTALLATION DIAGRAMS