United Kingdom
casestudy.nonresidential
Supply and Installation of 4 x Ø450 System Chimneys serving Dieselec Thistle Generators providing back up power to the Hospital. The exhausts were connected to the containerised plant rooms with framework allowing the horizontal exhausts to run parallel in pairs one in sets of two one above the other before reaching the main building where they could be supported directly from the building running horizontally then turning vertically before rising to termination after a 40m run.
United Kingdom
casestudy.nonresidential
Supply and Installation of 6 x Ø500 System Chimneys serving FG Wilson Gen Sets providing back up power to the Hospital. The exhausts needed to run horizontally above the entrance to the hotel before rising vertically to reach the roof of the energy centre, from where a further extended horizontal run was required with support before turning into th e main vertical runs supported from the existing concrete stack.
United Kingdom
casestudy.nonresidential
Supply and installation of 3 x Ø250 system chimneys designed to serve Viessmann Vitoplex 200 condensing boilers, along with 1 x Ø350 system chimney catering to a Viessmann Kob Pyrot biomass boiler. The chimneys are configured to run horizontally from the plant room, transitioning seamlessly into an aluminum-clad windshield that rises vertically through the curved roof of the Energy Centre plant room, ensuring efficiency and durability.