United Kingdom
casestudy.residential
Schiedel ran a competition when introducing the GARDEN FIREPLACE concept in the UK market. The competition was launched nationally with designers submitting a concept to show off the GARDEN FIREPLACE in different settings. The project would be recorded from design through assembly to final completion. The best designs submitted would win the prize of the GARDEN FIREPLACE supplied to the site.
United Kingdom
casestudy.nonresidential
Supply and Installation of 4 x Ø450 System Chimneys serving Dieselec Thistle Generators providing back up power to the Hospital. The exhausts were connected to the containerised plant rooms with framework allowing the horizontal exhausts to run parallel in pairs one in sets of two one above the other before reaching the main building where they could be supported directly from the building running horizontally then turning vertically before rising to termination after a 40m run.
United Kingdom
casestudy.nonresidential
Supply and installation of 22 stainless steel system chimneys with a supporting mast for the energy centre. The mast and chimneys needed to be lowered through an opening in the roof of the building by crane meaning that the plan needed to come together for the supply and erection of the chimneys on the mast sections, to be delivered to site in full and on time to tie in with the crane hire.