Heating plant Kraljevo

  • Non-Residential
  • Carried out in Serbia in 2022
  • Product(s) used:  ICS
  • Renovation
  • Boilers (Biomass, Condensing,...)
  • Energy Centre
The project involved the supply and technical support for the installation of 5 ICS 50 Ø1200 system chimneys, each serving a 21MW gas boiler. The chimneys were installed along an 11-meter horizontal route, with a vertical section extending 31.5 meters. The ICS 50 system, known for its ease of installation and thermal insulation, includes Expl/Impl valves and high-temperature-resistant mineral wool insulation for optimal performance.

Challenge

This project involved the supply and technical support during the installation of 5 ICS50 chimney systems, designed to follow pre-agreed routes from gas boilers. The horizontal sections of the chimneys extend 11 meters, while the vertical part reaches a height of 31.5 meters. Each installed chimney includes an Expl/Impl valve to enhance safety and ensure optimal functionality. The ICS50 system is known for its precision engineering, reliability, and ease of installation, providing an efficient solution for large-scale heating systems.

Solution

The ICS50 System Chimney solution was selected for its engineered precision joints and the designation T400 N1 W V2, making it a reliable and efficient choice. Known for its ease of installation and proven track record, the ICS50 system features continuous thermal insulation, ensuring high performance. The chimneys are equipped with high-temperature-resistant mineral wool insulation, which serves as an effective barrier against heat loss, contributing to the overall efficiency and durability of the system.

The Customer

The central heating plant in the city of Kragujevac, located in central Serbia, plays a vital role in providing heating and hot water to residential buildings in the central part of the city. With a total installed power of 100 MW, the plant ensures a reliable and efficient energy supply for the local community, supporting residential comfort during colder months. This robust system is key to meeting the growing energy needs of the city, offering both sustainability and reliability in urban heating infrastructure.

Other Projects

United Kingdom

casestudy.residential

House of Alchemy

Schiedel ran a competition when introducing the GARDEN FIREPLACE concept in the UK market. The competition was launched nationally with designers submitting a concept to show off the GARDEN FIREPLACE in different settings. The project would be recorded from design through assembly to final completion. The best designs submitted would win the prize of the GARDEN FIREPLACE supplied to the site.

READ MORE

United Kingdom

casestudy.nonresidential

Gartnavel Hospital

Supply and Installation of 4 x Ø450 System Chimneys serving Dieselec Thistle Generators providing back up power to the Hospital. The exhausts were connected to the containerised plant rooms with framework allowing the horizontal exhausts to run parallel in pairs one in sets of two one above the other before reaching the main building where they could be supported directly from the building running horizontally then turning vertically before rising to termination after a 40m run.

READ MORE

United Kingdom

casestudy.nonresidential

Scottish Southern General Hospital

Supply and installation of 22 stainless steel system chimneys with a supporting mast for the energy centre. The mast and chimneys needed to be lowered through an opening in the roof of the building by crane meaning that the plan needed to come together for the supply and erection of the chimneys on the mast sections, to be delivered to site in full and on time to tie in with the crane hire.

READ MORE