Supply and Installation of 4 x Ø450 System Chimneys serving Dieselec Thistle Generators providing back up power to the Hospital. The exhausts were connected to the containerised plant rooms with framework allowing the horizontal exhausts to run parallel in pairs one in sets of two one above the other before reaching the main building where they could be supported directly from the building running horizontally then turning vertically before rising to termination after a 40m run.

Challenge

This work included the supply and installation of 4 number ICS5000 twin wall generator flues following agreed routes across generator containers supported on Big Foot and Unistrut framework before turning and being connected to the external wall of the structure, then rising up the external facade almost 40m terminating approximately 3m above roof level. Due to the profile of external concrete cladding panels Hilti resin bonded anchors were required to be installed at each flue support location.

Solution

Owing to limited site access Schiedel employed the services of specialist rope access teams allowing the installation of the external vertical flues. The ICS5000 System Chimney solution with its engineered precision joints and a designation of T600 H1 D V3 was chosen due to its ease of installation and proven track record. Detailed Risk Assessments and Method Statements were required to be submitted for approval by NHS authorities prior to commencement on-site.

The Customer

Gartnavel General Hospital, located in the West End of Glasgow, Scotland, is a renowned teaching hospital providing a wide range of healthcare services. It is situated near Great Western Road, nestled between the neighborhoods of Hyndland, Anniesland, and Kelvindale. The hospital benefits from excellent transport links, as it is conveniently adjacent to Hyndland railway station, ensuring easy access for patients, visitors, and staff alike.

Other Projects

United Kingdom

casestudy.nonresidential

Glasgow Royal Infirmary

Supply and Installation of 6 x Ø500 System Chimneys serving FG Wilson Gen Sets providing back up power to the Hospital. The exhausts needed to run horizontally above the entrance to the hotel before rising vertically to reach the roof of the energy centre, from where a further extended horizontal run was required with support before turning into th e main vertical runs supported from the existing concrete stack.

READ MORE

United Kingdom

casestudy.residential

House of Alchemy

Schiedel ran a competition when introducing the GARDEN FIREPLACE concept in the UK market. The competition was launched nationally with designers submitting a concept to show off the GARDEN FIREPLACE in different settings. The project would be recorded from design through assembly to final completion. The best designs submitted would win the prize of the GARDEN FIREPLACE supplied to the site.

READ MORE

United Kingdom

casestudy.nonresidential

Lochaber High School

Supply and installation of 3 x Ø250 system chimneys designed to serve Viessmann Vitoplex 200 condensing boilers, along with 1 x Ø350 system chimney catering to a Viessmann Kob Pyrot biomass boiler. The chimneys are configured to run horizontally from the plant room, transitioning seamlessly into an aluminum-clad windshield that rises vertically through the curved roof of the Energy Centre plant room, ensuring efficiency and durability.

READ MORE