United Kingdom
casestudy.nonresidential
Supply and Installation of 6 x Ø500 System Chimneys serving FG Wilson Gen Sets providing back up power to the Hospital. The exhausts needed to run horizontally above the entrance to the hotel before rising vertically to reach the roof of the energy centre, from where a further extended horizontal run was required with support before turning into th e main vertical runs supported from the existing concrete stack.
United Kingdom
casestudy.residential
Schiedel ran a competition when introducing the GARDEN FIREPLACE concept in the UK market. The competition was launched nationally with designers submitting a concept to show off the GARDEN FIREPLACE in different settings. The project would be recorded from design through assembly to final completion. The best designs submitted would win the prize of the GARDEN FIREPLACE supplied to the site.
United Kingdom
casestudy.nonresidential
Supply and installation of 3 x Ø250 system chimneys designed to serve Viessmann Vitoplex 200 condensing boilers, along with 1 x Ø350 system chimney catering to a Viessmann Kob Pyrot biomass boiler. The chimneys are configured to run horizontally from the plant room, transitioning seamlessly into an aluminum-clad windshield that rises vertically through the curved roof of the Energy Centre plant room, ensuring efficiency and durability.