Chimneys, stoves and ventilation solutions
engineered for your life.

Back to the overview

Replacement flue header installed

(Washington, Tyne and Wear, 10. January 2018) …and additional Remeha Boiler installed. Arthur Dann Court, in Portsmouth, built in 1988, provides accommodation with support when needed. The residents are able to live as independently as possible in their own homes. With 49 flats, the building is home to a number of people and, as expected, regular social activities take place in a safe and secure environment.

Our project in Arthur Dann Court in Portsmouth was for a replacement flue header, which connected to the existing riser. The previous header was leaking considerably due to a bad design. Schiedel also added a third Remeha boiler to the system via the rear branch

 

Schiedel used the 100mm ID Prima Plus  system connecting into a 200mm ID Prima Plus header which then connects into the existing flue.

 

Prima Plus is regularly used in Commercial applications as it is a high quality 316L stainless steel single wall flue system with a wall thickness of 0.6mm. It is designed for use on gas and oil burning stoves and boilers with continuous operating temperatures up to 450°C and short firing up to 600°C. With the addition of a gasket to the joint, Prima Plus is designed for fluing condensing gas and oil appliances with positive pressures up to 200Pa, continuous operating temperatures up to 160°C and short firing up to 200°C.

 

Again it shows how efficient Schiedel are in completing various projects. For more details on our products and services, please browse the website, take a look at our social channels, or contact us.

More related content

Guide

Revised UK Building Regulations – Part L: updating boiler systems

UK Building Regulations for England were recently changed in view to achieving the governments “net zero” target. This now refers to individ...

Read now

News

Flue System at Newcastle Civic Centre.

Schiedel installed a temporary flue system to keep the Civic Centre heated up during the Winter months, as part of an ongoing project.

Read now

News

Flue for a distribution centre in Amesbury.

Highly efficient ICS 5000 installation.

Read now