Schiedel ran a competition when introducing the GARDEN FIREPLACE concept in the UK market. The competition was launched nationally with designers submitting a concept to show off the GARDEN FIREPLACE in different settings. The project would be recorded from design through assembly to final completion. The best designs submitted would win the prize of the GARDEN FIREPLACE supplied to the site.
United Kingdom
casestudy.nonresidential
Supply and installation of 3 x Ø250 system chimneys designed to serve Viessmann Vitoplex 200 condensing boilers, along with 1 x Ø350 system chimney catering to a Viessmann Kob Pyrot biomass boiler. The chimneys are configured to run horizontally from the plant room, transitioning seamlessly into an aluminum-clad windshield that rises vertically through the curved roof of the Energy Centre plant room, ensuring efficiency and durability.
United Kingdom
casestudy.nonresidential
Supply and Installation of 4 x Ø450 System Chimneys serving Dieselec Thistle Generators providing back up power to the Hospital. The exhausts were connected to the containerised plant rooms with framework allowing the horizontal exhausts to run parallel in pairs one in sets of two one above the other before reaching the main building where they could be supported directly from the building running horizontally then turning vertically before rising to termination after a 40m run.