(Washington, Tyne and Wear, 08. June 2021) Based in Newbury, Falcon Flues have over 30 years of experience providing a comprehensive flue and chimney design, supply and installation service throughout the UK for the commercial and domestic sectors using our Schiedel Metaloterm range as well as ICS 5000 range.
They provide a comprehensive chimney and exhaust design, supply and installation service throughout the UK to suit customer requirements. And pride themselves on offering a high level of service, working closely in a partnership relationship with their customers throughout the lifecycle of the projects using the Schiedel Metaloterm range of flues.
Our experienced engineers conduct fully detailed site surveys before offering technical advice regarding a range of solutions and, if required, CCTV surveys can also be carried out.
Our team of estimators and project managers are able to provide a full design service ensuring that the solution proposed meets all of the project requirements as well as the appropriate standards and legislation
Our professional installation teams are fully trained and experienced in the installation of all flue and exhaust systems and have the requisite health and safety and skills certifications to enable them to work on any type or scale of project.
Each project is managed by an experienced dedicated Project Manager who will act as the point of contact for all elements of the project and is fully committed to ensuring that it is delivered efficiently and on time and legislation.
Exhaust systems were required to serve 4 new No Cummins QSK90-G4 3000 KW Generators in a large data centre in Slough. 2 No 15 metre high rectangular masts were installed, each housing 2 No 600mm ID stainless steel twin wall insulated exhaust systems which were fitted to the masts prior to delivery to site.
Exhaust systems were required to serve 4 No Cummins C3000D5E 2400 KW generators in a large data centre in Slough. 4 No 450mm ID stainless steel twin wall insulated exhaust systems were installed into a steel frame before being transported to site. The frames were installed using cranes and then specialist steeplejacks completed the installation through to termination.
Exhaust systems and silencers were required to serve 6 No Perkins P2250-1 1800 KW generators being installed in the building known as Twentytwo in Bishopsgate, London. 6 No 500mm ID stainless steel twin wall insulated exhaust systems as well as primary and secondary silencers were installed from the 57th floor to termination on the 59th floor.
A flue system was required to serve 2 No 1200 KW Hartley & Sugden forced draught boilers at the BBC Studios in Maida Vale due to the the existing flue liner within a freestanding concrete stack collapsing. 2 No 400mm ID stainless steel twin wall insulated flue systems were installed from the boilers through to outside the boiler room and then up the outside of the concrete stack for 15 metres.
Exhaust systems were required for 5 No Mitsubishi s16R2-PTAW2-E 2000 KW generators serving a gas fired power station in Hull. In phase 1 a 40 metre high free standing multi core chimney was installed which incorporated 5 No 600mm ID stainless steel twin wall insulated exhaust systems. In phase 2 the exhausts were installed from the chimney back to the generators.