Chimneys, stoves and ventilation solutions
engineered for your life.
(Washington, Tyne and Wear, 12. October 2017) A recent project was completed with Dale Power Solutions, which also involved using a 38 metre length truck mounted MEWP to stretch to the work area.
A Uni-strut framework was installed on the fire escape steel around the stair case. This was to support the exhaust flue riser. The framework clamped to the steel work, and cantilever arms passed through at the opens sections of the surround. These open sections were covered in bird mesh.
The flue terminated in an OPEN terminal, approximately 1- 2m above the roof of the fire escape staircase.
Again it shows how efficient Schiedel are in completing various projects.
News
If you are on a diet, then it’s not recommended to visit Haydens Bakery, as you will see some of the most exquisite looking sweet delights y...
News
Schiedel installed a temporary flue system to keep the Civic Centre heated up during the Winter months, as part of an ongoing project.
News
The Wellcome Genome Campus homes some of the world’s advanced organisations in the field of genomics and computational biology.